RosterElf Logo
Start trial
HOW-TO GUIDE

How to roster maritime and offshore oil & gas staff

Create compliant swing rosters for offshore vessel crews and rig/production staff under the Maritime Offshore Oil and Gas Award (MA000086) and the Hydrocarbons Industry (Upstream) Award (MA000062), including even-time swings, fatigue and hours of rest, and offshore tickets.

40 min read MA000086 · MA000062
Steve Harris

Written by

Steve Harris

Free overtime & penalty rate calculator

Model weekend, public holiday, and overtime costs across a swing so offshore labour budgets are accurate before you publish.

Free Tool
Important disclaimer General information only – not legal advice

This guide provides general information about maritime and offshore oil & gas rostering under Australian awards. Many offshore operations are covered by enterprise agreements with additional provisions. It does not constitute legal, HR, or professional advice and should not be relied on as a substitute for advice specific to your business, workforce, or circumstances.

Key takeaways

  • Offshore work splits across two awards — vessel crew under the Maritime Offshore Oil and Gas Award (MA000086) and rig/production crew under the Hydrocarbons Industry (Upstream) Award (MA000062)
  • Crews work swing (even-time) rosters such as 2/2, 3/3, 4/4 and 28/28, mobilising by FIFO, DIDO or BIBO with travel days built into each swing
  • Manage fatigue with at least 8 consecutive hours of rest for shiftworkers, 12-hour shifts, and ordinary hours averaged over up to 26 weeks
  • Verify AMSA tickets and offshore survival certifications before mobilising — the award is the floor, so check the rates guides for pay figures

Maritime and offshore rostering in Australia

Rostering maritime and offshore oil & gas staff in Australia means planning long swings on remote vessels and platforms, managing crew fatigue, and getting award coverage right across two separate awards. Unlike fixed-location businesses, offshore workforce management revolves around even-time swing rosters, 12-hour shifts, hours-of-rest minimums, and mobilisation by air, road or boat. Getting the pattern, the tickets and the award right is what keeps crews safe and pay compliant.

The first thing to settle is coverage. Marine crew on vessels, rigs and floating facilities are covered by the Maritime Offshore Oil and Gas Award (MA000086), while drilling, platform and production employees sit under the Hydrocarbons Industry (Upstream) Award (MA000062). These awards set the floor for pay and conditions — see our overview of how offshore oil and gas pay works for context.

Industry reality: Offshore operations face remote-site fatigue risk, weather and logistics disruptions, and strict certification requirements. Poor rostering leads to fatigue-related safety incidents, workers mobilised without valid tickets, and underpayment claims when the wrong award or averaging period is applied.

This guide provides a comprehensive approach to creating compliant offshore rosters that meet award requirements, support crew safety, manage fatigue across long swings, and control operational labour costs. Learn more about maritime and offshore rostering software.

AWARD COVERAGE

Which award covers offshore staff

Offshore work splits across two awards. Match each crew to the right one, then check the relevant rates guide for current classification figures.

Workforce / settingAwardRates guide
Offshore vessel crew (marine crew on vessels, rigs, floating facilities) Maritime Offshore Oil and Gas Award (MA000086) Maritime offshore award guide
Rig, platform & production crews (drilling and production employees) Hydrocarbons Industry (Upstream) Award (MA000062) Hydrocarbons (Upstream) guide
Onshore upstream exploration & operations Hydrocarbons Industry (Upstream) Award (MA000062) Hydrocarbons (Upstream) guide

Critical: The award is the floor and does not set your final pay figures here — for current classification rates, penalties and allowances, use the Maritime Offshore Oil and Gas Award guide for vessel crew and the Hydrocarbons (Upstream) guide for rig and production crew.

STEP-BY-STEP

6 steps to compliant offshore rostering

Follow these steps to create compliant and effective swing rosters for maritime and offshore oil & gas crews.

1

Confirm which award applies

Offshore work splits across two awards. Vessel crew are covered by the Maritime Offshore Oil and Gas Award (MA000086), while rig and production crews sit under the Hydrocarbons Industry (Upstream) Award (MA000062).

Key points:

  • MA000086 covers marine crew on vessels, rigs and floating facilities offshore
  • MA000062 covers drilling, platform and production employees
  • Onshore upstream exploration and operations also fall under MA000062
  • Professional engineers and some staff roles may be award-free
2

Classify staff by role and level

Assign each worker the correct classification so their base pay and penalties are right. The award is the floor — check the relevant rates guide for current figures.

Key points:

  • Match each role to the award classification descriptors, not just job title
  • Vessel crew are classified under MA000086; rig and production crew under MA000062
  • Casual employees receive a casual loading on the base rate
  • See the award-rate guides for current classification figures
3

Choose the swing or cycle roster

Decide the swing pattern and mobilisation method for each crew, and account for travel days on every rotation.

Key points:

  • Common even-time cycles include 2/2, 3/3, 4/4 and 28/28 (weeks or days on/off)
  • FIFO, DIDO and BIBO describe fly-, drive- and boat-in/out mobilisation
  • Even-time rosters give equal time on and off for better fatigue balance
  • Build travel and mobilisation days into each swing
4

Apply penalties, overtime and averaging

Calculate weekend, public holiday and overtime correctly, and remember offshore ordinary hours can be averaged over an extended period.

Key points:

  • 12-hour shifts are common offshore and are set in the roster or agreement
  • Ordinary hours can be averaged over up to 26 weeks to suit long swings
  • Weekend, public holiday and overtime penalties apply on top of the base rate
  • Refer to the award-rate guides for the exact penalty percentages
5

Manage fatigue, hours of rest and tickets

Build rosters that respect minimum rest, manage fatigue across long swings, and keep offshore tickets current.

Key points:

  • Provide at least 8 consecutive hours of rest for shiftworkers under the award
  • Monitor cumulative hours across the whole swing, not just each day
  • Verify AMSA tickets and offshore survival certifications before mobilising
  • Confirm offshore medicals and inductions are current before travel
6

Publish and sync to payroll

Share the roster and send approved hours to payroll with award interpretation applied.

Key points:

  • Publish shifts to the mobile app so crews see their swing instantly
  • Export approved hours to Xero or MYOB without re-keying
  • Apply automatic award interpretation to penalties and allowances
  • Refresh classification rates each 1 July
HOURS & FATIGUE

Hours of rest, shift length and averaging

The mechanics that shape an offshore roster: minimum rest, 12-hour shifts, and averaging ordinary hours across a long swing. Penalty figures live in the award-rate guides.

RuleRequirementNotes
Minimum rest between shifts At least 8 consecutive hours off Award minimum for shiftworkers
Ordinary shift length Commonly up to 12 hours per shift Set in the roster or agreement
Hours averaging Ordinary hours averaged over up to 26 weeks Suits long even-time swings
Weekend & public holiday work Penalty rates apply See the award-rate guides for exact %
Overtime Paid once ordinary or averaged hours are exceeded See the award-rate guides for exact %

Weekend, public holiday and overtime penalties apply on top of the base rate and are set in each award. Use our penalty rate calculator to model swing costs, and check the rates guides for exact percentages.

SWING ROSTERS

Common offshore swing roster patterns

Even-time swing and cycle patterns for offshore vessels, rigs and production facilities.

2/2

2 weeks on, 2 weeks off

Even-time vessel & production crews

3/3

3 weeks on, 3 weeks off

Longer offshore campaigns

4/4

4 weeks on, 4 weeks off

Remote and deepwater operations

28/28

28 days on, 28 days off

Common even-time cycle

FIFO / DIDO / BIBO

Fly-, drive- or boat-in/out mobilisation

Travel days built into each swing

Swing fatigue management

Swing rosters must consider fatigue management principles. Long cycles (3/3, 4/4, 28/28) increase cumulative fatigue, and mobilisation by FIFO, DIDO or BIBO adds travel days on top. Monitor cumulative hours across the whole swing, protect minimum rest, and use even-time patterns to balance recovery with production.

SAFETY

Fatigue, hours of rest and tickets for offshore rostering

Offshore work has strict fatigue and certification requirements that must be factored into rostering decisions.

Critical safety and certification factors for offshore rostering:

Hours of rest: Provide at least 8 consecutive hours of rest between shifts for shiftworkers, in line with the award.
AMSA tickets & certifications: Verify AMSA seafarer certificates and any role-specific tickets are current before mobilising crew offshore.
Offshore survival training: Confirm offshore survival training and medicals are valid before workers travel to a vessel or platform.
Fatigue across swings: Monitor cumulative hours across the whole swing and the 26-week averaging period, following Safe Work Australia fatigue guidelines.
Right to disconnect: From August 2025, employees can refuse contact outside hours unless the refusal is unreasonable — factor this into between-swing contact.
AVOID THESE

Common offshore rostering mistakes

Avoid these costly errors that lead to compliance issues, safety risks, and underpayment claims.

Applying the wrong award

Consequence: Underpayment or overpayment when vessel and rig crews are treated under the same award

Solution: Split coverage correctly — vessel crew under the Maritime Offshore Oil and Gas Award and rig/production crew under the Hydrocarbons (Upstream) Award

Missing minimum hours of rest

Consequence: Fatigue-related safety risk and possible award breaches

Solution: Give shiftworkers at least 8 consecutive hours of rest between shifts and monitor cumulative hours across the swing

Rostering without current tickets

Consequence: Workers mobilised without valid certifications, creating safety and compliance exposure

Solution: Verify AMSA tickets, offshore survival certifications and medicals before mobilising to a vessel or platform

Ignoring 26-week hours averaging

Consequence: Overtime miscalculated when long swings are assessed on a weekly basis

Solution: Assess ordinary hours over the averaging period and automate the calculation with award interpretation

Keeping long-term casuals on regular swings

Consequence: Casual conversion disputes and entitlement claims

Solution: Review casual arrangements regularly and consider permanent conversion for workers on regular swing rosters

Not updating rates each July

Consequence: Underpayment claims once the annual wage review takes effect

Solution: Refresh classification rates every 1 July and let rostering software apply the new figures

ADVANCED

Advanced offshore rostering strategies

Strategies for complex offshore rostering scenarios and continuous-operation workforce optimization.

Even-time and back-to-back swing rostering

Offshore operations that run around the clock need paired crews covering back-to-back swing lines, with clear handovers and correct treatment of averaged hours across the cycle.

  • Crew rotation: Use paired even-time lines (2/2, 4/4, 28/28) so every shift is covered without gaps across the swing
  • Averaging: Assess ordinary hours across the 26-week averaging period rather than a single week when checking overtime
  • Award split: Apply the correct award to vessel crew versus rig/production crew on the same operation

Learn more: FIFO roster patterns explained

Skills and ticket-based allocation

Match qualified workers to shifts based on AMSA tickets, offshore survival certifications, and classification level. Different roles require specific coverage and supervision on every swing.

Example ticket requirements by activity:

  • Vessel & marine crew: AMSA seafarer certificates
  • Mobilising offshore: Offshore survival training & medicals
  • Drilling & production: Rig-specific competencies
  • All crew: Current inductions & site clearances

Tip: Use rostering software with skills tagging to ensure ticketed workers are assigned to appropriate roles and receive roster warnings for missing or expiring certifications.

Fatigue and mobilisation contingency planning

Weather delays, flight and boat disruptions, and sickness are common on offshore swings. Build flexibility into rosters to cover absences without breaching minimum rest or pushing crews into unsafe fatigue.

  • Relief pool: Maintain a pool of ticketed relief workers to cover mobilisation delays and unplanned absences
  • Rest limits: Protect the minimum 8 consecutive hours of rest and enforce cumulative-hour limits before extending a swing
  • Real-time costing: Use accurate time capture to see wage costs across the swing before you commit to extra shifts
FREE TOOLS

Free offshore rostering calculator

Model weekend, public holiday, and overtime costs across a swing so offshore labour budgets stay accurate before you publish.

Overtime & penalty rate calculator

FEATURED

Calculate weekend, public holiday, and overtime penalty costs for accurate offshore swing payroll.

Try calculator
SOFTWARE

Maritime and offshore rostering software

How specialized rostering software simplifies offshore workforce management, swing planning, and award compliance.

Trusted by Australian resources and maritime businesses

RosterElf helps maritime, offshore and resources operators manage complex swing and even-time rosters with support for award compliance. Join 30,000+ Australian businesses rostering smarter.

Explore maritime software

Right to disconnect (New from August 2025)

From 26 August 2025, employees of small business employers have the right to disconnect - meaning they can refuse to monitor, read, or respond to contact from their employer outside of working hours unless the refusal is unreasonable. This applies to offshore workers and should be considered when planning contact during a crew's time off between swings.

Regulatory sources & compliance

This guide is aligned with official Australian offshore and maritime workplace regulations and safety standards.

Streamline offshore rostering

RosterElf helps maritime and offshore businesses manage swing and even-time crews, track tickets and certifications, and support your compliance efforts across the offshore awards. Built for Australian businesses.

Start trial See maritime rostering
4.8 stars by 1,570 users
100+ countries 30,000+ users
VERIFIED RATINGS

Trusted by 30,000+ workplaces

4.7+ average

Rated on Xero · Google · G2 · Capterra

Simplify your rostering today

Join thousands of Australian businesses using RosterElf to create compliant rosters, apply award interpretation, and manage swing and even-time offshore crews. Built for Australian businesses.

Start trial See maritime rostering
4.8 stars by 1,570 users
100+ countries 30,000+ users
FAQ

Frequently asked questions

  • Offshore oil and gas workers typically work swing (cycle) rosters — a block of days or weeks on the vessel or platform followed by an equal or set block off. Common even-time cycles include 2/2, 3/3, 4/4 and 28/28 (weeks or days on then off). The right pattern depends on how remote the operation is, whether it runs continuously, and fatigue considerations. Read more in our guide to FIFO roster patterns explained.
  • An even-time roster gives a worker equal time on and off — for example 2 weeks on then 2 weeks off (2/2), or 28 days on then 28 days off (28/28). Even-time cycles are common offshore because the extended time off helps crews recover from long shifts and the travel involved in getting to a remote vessel or platform. Workers usually mobilise by FIFO, DIDO or BIBO (fly-, drive- or boat-in/out), so travel days should be built into each swing.